File #: ID 16-0400    Version: 1 Name: Change Order No. 2 Airport
Type: Resolution Status: Passed
File created: 4/26/2016 In control: City Council
On agenda: 5/17/2016 Final action: 5/17/2016
Title: Resolution Approving Change Order in the Amount of $59,400 with Arcadis G&M of North Carolina, Inc. for the Airport Lift Station Replacement Sewer Design Contract 2014-0770
Indexes: District 5, WR Contracts
Attachments: 1. Sec State Arcadis, 2. Airport Sewer Additional Design C.O#2 proposal 2016-3-25-signed, 3. MWBE 2014-077 Airport Lift Station Change Order 2, 4. 16-0400 Resolution Change Order Airport Lift Station

Title
Resolution Approving Change Order in the Amount of $59,400 with Arcadis G&M of North Carolina, Inc. for the Airport Lift Station Replacement Sewer Design Contract 2014-0770

Body
Department: Water Resources
Council District: 5

Public Hearing: N/A
Advertising Date/By: N/A

Contact 1 and Phone: Steven Drew, 373-7893
Contact 2 and Phone: Mike Borchers, 373-2494

PURPOSE:
Water Resources is requesting a contract change order to the Airport Lift Station Replacement Sewer Design Contract 2014-0770 to provide additional design services and coordination efforts associated with the proposed gravity sewer line that will replace the existing Airport Lift Station. In order to provide the additional design services approval for a contract change order is requested.

BACKGROUND:
The City authorized professional services design contract 2014-0770 with Arcadis G&M Of North Carolina, Inc. in the amount of $209,000 to design a gravity sewer line to abandon the existing Airport lift station. The project included design and construction drawings for 8,000 feet of 16-inch gravity sewer through the PTIA property and the abandonment and demolition of the existing Airport lift station. Change Order No. 1 in the amount of $90,600.00 was approved on July 31, 2015 to cover changes to the original sewer line alignment necessary for meeting State permitting constraints. The new alignment included provisions meant to provide cost savings in the project construction phase. Change Order No. 2 includes additional efforts and engineering design work associated with new permitting requirements imposed by NC Department of Transportation and Piedmont Triad Airport Authority (PTAA). Additional requirements include a roadway support shoring plan, traffic control plan, environmental evaluation of PTAA wetlands and buffers and fencing and security measures on stormwater grates. Additional coordination and field work needed to complete the final design is included as part o...

Click here for full text