File #: ID 16-0280    Version: 1 Name:
Type: Resolution Status: Passed
File created: 3/21/2016 In control: City Council
On agenda: 5/3/2016 Final action: 5/3/2016
Title: Resolution Rescinding Council Resolution 085-15 and Authorizing Award of the Downtown Greenway Phase 2e/3a Construction Engineering and Inspections Contract to Michael Baker Engineering, Inc.
Attachments: 1. Council Resolution085-15 4-7-15.pdf, 2. 16-0280 RESOLUTION.pdf

Title
Resolution Rescinding Council Resolution 085-15 and Authorizing Award of the Downtown Greenway Phase 2e/3a Construction Engineering and Inspections Contract to Michael Baker Engineering, Inc.

Body
Department: Engineering & Inspections
Council District: 3

Public Hearing: N/A
Advertising Date/By N/A:

Contact 1 and Phone: Kenney McDowell 373-2302
Contact 2 and Phone: Ted Partrick 373-2302

PURPOSE:
Michael Baker Engineering, Inc. was selected to provide construction engineering and inspections services for the construction of Downtown Greenway Phases 2e and 3a. City Council approval of the professional services contract with Michael Baker Engineering, Inc., in the amount of $419,795.83 is requested. Council is also requested to rescind resolution 085-15.

BACKGROUND:
Construction of a next section of the Downtown Greenway was advertised on March 26, 2015, under contract 2011-003 (EL-5101DO), but no acceptable bids were received after three bidding attempts. That section included the greenway sections on Fisher Avenue from Greene to Eugene (Phase 2e), on Eugene Street from Fisher to Battleground to Smith (3a), and on Smith Street from Spring to the Tradition Cornerstone at Prescott (3c).

Following discussions with Transportation, Engineering, NCDOT and the consultants, it was decided to remove Phase 3c from this construction contract. Phase 3c will be constructed at a later time. Construction of Phases 3a and 2e was recently advertised on March 17, 2016, and a new contract for construction engineering and inspections is required.

Council approved award of a construction engineering and inspections contract to Michael Baker on April 7, 2015, for Phases 2e, 3a and 3c in the amount of $577,662.66. A copy of that resolution is attached. With the removal of Phase 3c, however, a new contract with Michael Baker is needed to reduce the cost and to meet NCDOT requirements. The new resolution for that award is also attached. The previous...

Click here for full text