File #: ID 18-0602    Version: 1 Name:
Type: Ordinance Status: Failed
File created: 9/10/2018 In control: City Council
On agenda: 10/16/2018 Final action: 10/16/2018
Title: Ordinance Annexing Territory into the Corporate Limits for Property Located at 3321 Old McConnell Loop, a Portion of 4220 Holts Chapel Road and 742-754 JFH Dairy Road - 72.5 Acres (EHL Development, LLC)
Sponsors: Planning
Attachments: 1. ehl sos.pdf, 2. old mcconnell loop petition.pdf, 3. PLP18-10_HoltsChplOldMcCJFH_Aerial.pdf, 4. PLP18-10_HoltsChplOldMcCJFH_Annex.pdf, 5. aug 2018 pb minutes.pdf, 6. 18-0602 old mcconnell loop ord.pdf
Related files: ID 18-0642, ID 18-0643
Title
Ordinance Annexing Territory into the Corporate Limits for Property Located at 3321 Old McConnell Loop, a Portion of 4220 Holts Chapel Road and 742-754 JFH Dairy Road - 72.5 Acres (EHL Development, LLC)

Body
Department: Planning
Council District: Nearest to District #1

Public Hearing: Yes
Advertising Date/By: October 4 and 11, 2018/City Clerk

Contact 1 and Phone: Sue Schwartz at 373-2149
Contact 2 and Phone: Steve Galanti at 373-2918

PURPOSE:
EHL Development, LLC has petitioned for annexation of their property located at 3321 Old McConnell Loop. The City Council is required to hold a public hearing on this petition before considering its approval.

BACKGROUND:
The portion of 4220 Holts Chapel Road, owned by the State of North Carolina, is located between 3321 Old McConnell Loop and Greensboro's current city limits and is annexed as part of the request.

This property is within the Tier 1 Growth Area (2013-2019) on the Growth Strategy Map in the Comprehensive Plan. The proposal is to develop the site with residential uses.

City water will be available by either connecting to the 8-inch water line along the south side of Holts Chapel Road or the 30-inch line located on the east side of JHF Dairy Road. The applicant is advised that a 12-inch water line extension along the Old McConnell Loop frontage of the site may be required. In order for this site to be served with water, the owner would be responsible for all costs associated with extending and connecting to the public line.

City sanitary sewer service will be available by connecting to the 15-inch outfall located approximately 1,400 feet to the east of the site. The applicant is advised that a public sewer extension may be required across the site to eliminate the need for the pump station currently located at the terminus of Reverend Williams Drive. Sewer service is also available by connecting to either the 8-inch line in Holts Chapel Road or the 8-inch outfall that cross the southern part...

Click here for full text