Title: Resolution Authorizing Execution of Contract in the Amount of $717,064.31 to Michael Baker Engineering, Inc. for the Construction Inspections of the Holts Chapel Road and Lowdermilk Street Widening and Sidewalk Improvements Project (EL-5101 DM)
Attachments: 1. sec of state.pdf, 2. 17-0469 resolution for const inspection.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Title
Resolution Authorizing Execution of Contract in the Amount of $717,064.31 to Michael Baker Engineering, Inc. for the Construction Inspections of the Holts Chapel Road and Lowdermilk Street Widening and Sidewalk Improvements Project (EL-5101 DM)

Body
Department: Engineering & Inspections
Council District: 1

Public Hearing: N/A
Advertising Date/By: N/A

Contact 1 and Phone: Adam Fischer 336-373-2861
Contact 2 and Phone: Kenney McDowell 336-373-2302

PURPOSE:
Michael Baker Engineering, Inc. was selected to provide construction inspection the Holts Chapel Road and Lowdermilk Street Roadway and Sidewalk Improvements Project. City Council approval of the professional services contract with Michael Baker Engineering, Inc. in the amount of $717,064.31 is requested.

BACKGROUND:
This project includes installation of intersection improvements: roadway widening, asphalt overlay, concrete sidewalks, driveways, curb and gutter, curb cuts, retaining walls, and associated erosion control items.

Our six on-call Consultant Engineering Inspections (CEI) professional services firms were considered for this project. Prime consideration was given to their past experience and performance with projects involving streetscape work, sidewalks, roadway configuration, traffic analysis, landscaping, utility design, and public participation. As a result of the analysis by the Transportation and Engineering & Inspections Departments, Michael Baker Engineering, Inc. was selected for the project.

The roadway work is to begin by October 2017 and is to be completed by September 2019.

This is a Federal Funded contract and is subject to 80% reimbursement by the FHWA.

BUDGET IMPACT:
Funds for the professional services contract are available in the following Street and Sidewalk Capital Project Fund account:

401-4551-01.6014 A15055

RECOMMENDATION / ACTION REQUESTED:
The Engineering & Inspections and Transportation Departments recommend authorizing the award in the amount of $717,064...