File #: ID 17-0102    Version: 1 Name: Lees Chapel Rd Feeder Main
Type: Resolution Status: Passed
File created: 1/23/2017 In control: City Council
On agenda: 2/21/2017 Final action: 2/21/2017
Title: Resolution Approving a Contract With Davis-Martin-Powell (DMP) & Associates, Inc. for Professional Services Contract for the Lees Chapel Road Feeder Main Project
Indexes: District 2, WR Contracts
Attachments: 1. DMP Sec State, 2. MWBE-Lees Chapel Feeder Main, 3. Lees Chapel Feeder Main_Proposal 11-23-2016 (3), 4. 17-0102 Resolution DMP Lees Chapel.pdf

 

Title

Resolution Approving a Contract With Davis-Martin-Powell (DMP) & Associates, Inc. for Professional Services Contract for the Lees Chapel Road Feeder Main Project

 

Body

Department: Water Resources

Council District: 2

 

Public Hearing: N/A

Advertising Date/By: N/A

 

Contact 1 and Phone: Steven D. Drew, 336-373-7893

Contact 2 and Phone: Virginia Spillman, 336-373-3260

 

PURPOSE:

The City of Greensboro Water Resources Department is requesting to enter into a professional services contract with DMP & Associates, Inc. to provide surveying, design and construction administration services for the Lees Chapel Road Feeder Main project.

 

BACKGROUND:

The purpose of the Lees Chapel Feeder Main is to provide redundancy and improve the capacity of the City’s water transmission system to supply water from the Townsend Water Treatment Plant (WTP) to the water distribution system. The existing 36” water main running parallel to Summit Avenue is the only water line that feeds water from Townsend WTP to the distribution system making the proposed Lees Chapel Feeder main essential for the City’s distribution system. Having another feed to Townsend WTP will also be valuable in the future because with the proposed Greensboro Outer Loop NCDOT Project U-2525C between Lawndale Drive and US Highway 29, the existing 36” water main in Summit Avenue will have to be relocated.   

 

The project consists on the installation of approximately 14,500 feet of 36-inch water main along Lees Chapel Rd. beginning at the intersection with Brightwood School Rd and extending northeast to Rudd Station Road/Southshore Road. The proposed 36” water main will cross the railroad tracks at Rudd Station Road, cross Southshore Road and continue northeast along Townsend Road.  Work under this contract consists of surveying, engineering design, permitting, bid preparation and construction administration services for the construction of the water main feed. 

 

The professional services of DMP & Associates, Inc., with Critek Engineering Group, PC., JC Waller & Associates, P.C. and Cartographic Aerial Mapping, Inc.  Minority Business Enterprises within the ten county MSA, will be utilized to provide surveying, design, and construction administration services for the installation of the feeder main. The anticipated MBE utilization for this design services contract is 13.4% of the total contract amount. DMP & Associates, Inc. was selected from the Water Resources on-call for professional services to provide a proposal and they were the only ones solicited therefore no other bids were received.

 

 

BUDGET IMPACT:

Funding for this project is budgeted in Water Resources Capital Fund Account 503-7026-01.5410 in the amount of $510,000. A budget adjustment is necessary to use this account.

 

 

RECOMMENDATION / ACTION REQUESTED:

The Water Resources Department recommends City Council approve the professional services contract with DMP & Associates, Inc. in the amount of $510,000 and the associated budget adjustment.