File #: ID 16-0769    Version: 1 Name: Old Battleground Water Line Extension
Type: Resolution Status: Passed
File created: 8/30/2016 In control: City Council
On agenda: 9/20/2016 Final action: 9/20/2016
Title: Resolution Approving a Contract with HDR Engineering, Inc. of the Carolinas for Professional Services Contract for the Old Battleground Water Line Extension Project
Indexes: District 3, WR Contracts
Attachments: 1. HDR Sec State, 2. Old Battleground full attach.pdf, 3. MWBE Memo Old Battleground Road 24” Water Line Extension Project, 4. 16-0769 Resolution HDR Old Battleground

 

Title

Resolution Approving a Contract with HDR Engineering, Inc. of the Carolinas for Professional Services Contract for the Old Battleground Water Line Extension Project

 

Body

Department: Water Resources

Council District: 3

 

Public Hearing: N/A

Advertising Date/By: N/A

 

Contact 1 and Phone: Steven D. Drew, 336-373-7893

Contact 2 and Phone: Virginia Spillman, 336-373-3260

 

PURPOSE:

The City of Greensboro Water Resources Department is requesting to enter into a professional services contract with HDR Engineering, Inc. of the Carolinas to provide design and construction administration services for the Old Battleground Water Line Extension project.

 

BACKGROUND:

The Old Battleground Water Line Extension project consists on the installation of approximately 2,650 feet of 24-inch water main along Old Battleground Ave. to an existing line 500 feet north of British Lake Drive. The project will improve pressure and flow around Battleground Ave. and Westridge Road.  Work under this contract consists of engineering design, permitting, bid preparation and construction administration services for the construction of the water line extension.  The professional services of HDR Engineering, Inc. of the Carolinas (HDR), an on-call consultant, with Critek Engineering Group, PC. a Minority Business Enterprise within the ten county MSA and part of the HDR on-call services team, will be utilized to provide design and construction administration services for the installation of the water line extension. The anticipated MBE utilization for this design services contract is 85.8% of the total contract amount.

 

BUDGET IMPACT:

Funding for this project is budgeted in Water Resources Capital Fund Account 503-7026-01.5410 in the amount of $109,200.

 

RECOMMENDATION / ACTION REQUESTED:

The Water Resources Department recommends City Council approve the professional services contract with HDR Engineering, Inc. of the Carolinas in the amount of $109,200.