File #: ID 16-0315    Version: 1 Name: Clearwell CA Change Order
Type: Resolution Status: Passed
File created: 3/30/2016 In control: City Council
On agenda: 4/19/2016 Final action: 4/19/2016
Title: Resolution Approving Change Order No.1 in the Amount of $258,600 with CDM Smith, Inc., for the Mitchell Water Treatment Plant Clearwell Replacement Construction Administration and Inspection Services Contract 2015-0830
Indexes: District 3, WR Contracts
Attachments: 1. Sec State CDM Smith, 2. CDMS_Scope, 3. MWBE CA Change Order 1, 4. 16-0315 Resolution Change Order Clearwell CA

Title
Resolution Approving Change Order No.1 in the Amount of $258,600 with CDM Smith, Inc., for the Mitchell Water Treatment Plant Clearwell Replacement Construction Administration and Inspection Services Contract 2015-0830

Body
Department: Water Resources
Council District: 3

Public Hearing: N/A
Advertising Date/By: N/A

Contact 1 and Phone: Steven Drew, 373-7893
Contact 2 and Phone: Mike Borchers, 373-2494

PURPOSE:
Water Resources is requesting a contract change order to the Mitchell Water Treatment Plant Clearwell Replacement Construction Administration and Inspection Services Contract 2015-0830 to provide additional construction oversight associated with the discovery of a failure on the 42-inch filter watermain. In order to oversee the pipe repair and additional field work, approval for a contract change order is requested.


BACKGROUND:
On January 4, 2016 the City authorized professional services construction administration and inspection services contract 2015-0830 with CDM Smith, Inc. in the amount of $471,400 to support the Mitchell Water Treatment Plant Clearwell Replacement Construction Project. This contract provides for onsite observations of the work and field check of materials and equipment for the construction of the Clearwell Replacement project. CDM Smith, Inc. was previously placed under contract to design, obtain permits and assist with the bidding of the improvements associated with the project. The change order will allow the engineering team to extend their onsite observation, evaluation and technical guidance to the additional work necessary for repairing the existing 42-inch filter watermain found to be leaking.

The Construction Administration and Inspection team for the original contract included CDM Smith and CriTek Engineering Group, P.C. CriTek Engineering Group, P.C. is a local MBE and their utilization is 32% of the original contract amount. CDM Smith's MBE commitment for the change order is consist...