File #: ID 15-0286    Version: 1 Name: TZO 56 MGD Upgrades Design Contract (2011-037) CO #1
Type: Resolution Status: Passed
File created: 3/23/2015 In control: City Council
On agenda: 4/7/2015 Final action: 4/7/2015
Title: Resolution Approving Change Order #1 in the Amount of $166,200 for Contract 2011-037 with CDM Smith, Inc. for TZO Water Reclamation Facility 56 MGD Upgrades Design
Indexes: District 2, WR Contracts
Attachments: 1. Agenda 150407 TZO 56 MGD Design Services CO #1 Template.pdf, 2. 15-0286 Reso. TZ Osborne.pdf

Title
Resolution Approving Change Order #1 in the Amount of $166,200 for Contract 2011-037 with CDM Smith, Inc. for TZO Water Reclamation Facility 56 MGD Upgrades Design

Body
Department: Water Resources
Council District: 2

Public Hearing: N/A
Advertising Date/By: N/A

Contact 1 and Phone: Steven Drew, 373-7893
Contact 2 and Phone: Mike Borchers, 373-2494

PURPOSE:
In order to incorporate into the TZO Water Reclamation Facility (WRF) 56 MGD Upgrades Package 3 project Construction Manager at Risk (CMAR) project designer services, facility Stormwater Best Management Practice (BMP) design improvements and treatment filter fast track replacement design support services as well as cover additional Package 2 bidding services City Council approval for change order number 1 to contract 2011-037 in the amount of $166,200 is requested.

BACKGROUND:
On May 3, 2011 the City entered into a professional services design contract 2011-037 with CDM Smith, Inc. in the amount of $4,901,400 for the TZO Water Reclamation Facility 56 MGD Upgrades Project. This project provides for the design and phased implementation (using four distinct construction packages) of hydraulic and treatment improvements at the TZO WRF and decommissioning of the North Buffalo WRF. The change order will allow the design engineering team to provide CMAR designer services for package 3, incorporate Stormwater BMP design improvements into package 3, support critical plant operations by fast tracking filter replacement design revisions, and cover additional bid support services necessary for the package 2 construction contract.

With all of the engineering design nearly complete, no M/WBE participation is planned with this change order. Although this change order doesn't achieve M/WBE participation, the existing contract for construction administration services during construction of this project, contract 2014-021 for $4,989,850 with CDM Smith, Inc., does achieve 11% MBE participation....