File #: ID 15-0103    Version: 1 Name:
Type: Resolution Status: Passed
File created: 1/20/2015 In control: City Council
On agenda: 2/3/2015 Final action: 2/3/2015
Title: Resolution Approving Extension of Professional Services Contract 2012-069A with Fleming Engineering, Inc. for the 2012 Sidewalk Design (EL-5101DL) Part 2
Attachments: 1. 15-0103 Reso. 2012-069A ext..pdf

Title
Resolution Approving Extension of Professional Services Contract 2012-069A with Fleming Engineering, Inc. for the 2012 Sidewalk Design (EL-5101DL) Part 2

Body
Department: Engineering & Inspections
Council District: All

Public Hearing: N/A
Advertising Date/By: N/A

Contact 1 and Phone: Adam Fischer, 373-2861
Contact 2 and Phone: Ted Partrick, 373 2302

PURPOSE:
Fleming Engineering, Inc. is being requested to provide additional engineering design services for the General Sidewalk Improvements EL-5101DL project. City Council approval of a contract extension to the professional services contract with Fleming Engineering in the amount of $18,008.21 is requested.

BACKGROUND:
Funding from a Congestion Mitigation and Air Quality (CMAQ) grant was approved by the Greensboro Urban Area Metropolitan Planning Organization (GUAMPO) for almost 18 miles of sidewalks on W. Friendly Avenue, English Street, Yanceyville Street, and Pisgah Church/Lees Chapel Road. This is the largest single sidewalk project the City has ever undertaken. To comply with the grant (EL-5101DL), the construction contract will be awarded to one contractor, but the design was split among three engineering firms.

On April 9, 2013, the City Manager approved award of a design contract to Fleming Engineering, Inc., for $275,441.12 for the Friendly Avenue portion and a section of the Yanceyville Street portion. Fleming Engineering is an engineering design firm in Greensboro. A contract extension to add accessible curb ramps and to redesign crosswalks was approved by the City Manager in the amount of $9,240.00 for a current contract total $284,681.12. A second contract extension is required to add the design of a retaining wall at a cost of $18,008.21. The new total contract amount will be $302,689.33. Because the contract would now exceed $300,000, Council approval is required for an extension.

The need for a custom design of a retaining wall was not identified during the or...